New Nystrom Elementary School Campus

Remodel and expansion of an entire elementary school campus in Richmond. What made this project unique is that many of the building structures were re-used, while the foundations that supported them were demolished and re-built. We worked closely with the general contractor and other trades to rough in walls and ceilings while the foundations were being built in order to keep up with the construction schedule.

Kaiser Hospital Operating Room Upgrade

A 39,000 sq ft expansion of an existing hospital, including emergency power, lighting, lighting controls, fire alarm, operating rooms and headwall units. Required connection to existing emergency, critical, life safety and normal power in an operating central plant.

Kaiser New Hospital Building

Construction of a new hospital including lighting, lighting controls, normal and emergency power distribution, fire alarm, nurse call, paging, and data systems.

Alta Bates Summit Life Safety Renovation

Remodel of approximately 35,000 square feet of an existing hospital including office spaces, auditorium, lobby areas, patient areas, and a family resource center. This project was completed in multiple phases in order to avoid impact to the owner.

George Mark Children’s Home

George Mark Children’s Home was a sixteen thousand square foot new building on the Fairmont Hospital Campus for severely ill children and their families. The project was built to replicate a large custom house to help the children and families feel at home. Del Monte Electric was honored to be part of this special project.

Mt. Diablo Unified School District Modernization

These nine school modernization were completed concurrently within an eight month period. We worked closely with the owner and general contractors to create a project schedule that allowed these projects to be completed in the limited time frame without disruption to the occupied campuses.

Doe Library, UC Berkeley

Complete demolition and renovation of the 100 year old historic Doe Library on the UC Berkeley campus. Included extensive lighting and controls, switchgear, medium voltage wiring, fire alarm, paging, telecommunications, and security systems.

MLK, Tyrrell, East Avenue Schools

This project involved the complete electrical, fire alarm, and intrusion alarm installations on three school sites. The work included modernization of existing buildings, wiring of new buildings, and complete electrical distribution and site work upgrades on the three sites, totaling 223,000 square feet of building space.

Chabot Student Center

Complete electrical, fire alarm, security and access control, paging, and voice/data systems installation on a new 60,000 square foot student center on the Chabot College Campus.

Exploratorium Rooftop Solar

Installation of roof mounted PV solar panels at the new Exploratorium project at Pier #15 in San Francisco. Required coordination with barge cranes to load roof and very congested staging conditions.

Mt. Diablo Unified School District

This project involved the installation of fixed PV solar panels on carport structures and rooftops at fifty-one school sites. This contract included the installation of PV panels, switchgear and wiring back to the utility point of connection. The majority of these sites were completed in occupied facilities.

Lafayette Park Hotel

Construction of a new hotel in Lafayette including lighting, lighting controls, power, fire alarm, security, and data systems.

Concord Pavilion Expansion

Complete renovation and expansion of the Concord Pavilion including stage lighting, controls, site work, and extensive catwalk work.

Market Place Shopping Center

All electrical work associated with this retail shopping center.

Clark Kerr Student Housing Renovation

Complete remodel of three existing dorm buildings totaling over 200,000 square feet of floor area. The work included medium voltage distribution, new line voltage distribution, fire alarm systems, security and access control systems, and voice/data systems.

The Essex Apartments

All electrical work associated with a twenty story high-rise apartment tower built along Lake Merritt in Oakland. This project encompassed 480,000 square feet and 285 apartment units. The scope of work included lighting, switchgear, emergency power distribution, bus duct, security, fire alarm, television, and data systems.

Walnut Creek Library

Construction of a new forty-five thousand square foot, two story library on top of an underground parking garage in downtown Walnut Creek. This was a “Green” building with several daylighting and dimmable lighting zones to reduce energy consumption. This building included conference and meeting rooms with state of the art audio visual systems. It also included lighting, normal and emergency power distribution, fire alarm, security, paging, and data systems.

1333 North California

Design/build contract to provide the electrical work for the core and shell. Work included lighting, gear, fire alarm, and data systems.

Temporary Surge Building, UC Berkeley

Design/Build contract to provide new classroom facilities at UC Berkeley to accommodate students while existing facilities are being renovated. The electrical design needed to be as flexible as possible to accommodate students from different majors and disciplines.

Light Source Building

Location: Berkeley Contract Amount: $1,850,000 General Contractor: Overaa Construction Description: Construction of a building at the Lawrence Berkeley Laboratory to house an atomic accelerator used to move a beam of energy at nearly the speed of light. Included lighting and controls, a transformer substation, and a fiber optic cable backbone.

Berkeley Farms Processing Facility

Location: Hayward Contract Amount: $4,000,000 General Contractor: Harris Construction Description: Included all electrical work and controls for a new milk processing facility in Hayward. Included extensive motor control work.

Sutter Health 2500 Milvia Medical Office Building

Design and build renovation of an existing 28,000 medical office building that was stripped down to the exterior walls and re-designed to meet current health care demands. Numerous exam rooms, office spaces, and conference spaces were designed and built with the latest technologies to meet the owner’s needs. BIM modeling was utilized to ensure that all systems were properly coordinated prior to installation.

San Ramon Community Center

Location:San Ramon Contract Amount: $2,600,000 General Contractor: J. Amoroso Construction Details; Construction of a new 80,000 sq ft laboratory and educational facility. Work included medium voltage cable & equipment, power distribution, lighting, lighting controls, fire alarm, intrusion alarm, telecommunication and audio-visual systems.

MOHCD 990 Pacific Ave. Multi Family Housing

Project Name:  990 Pacific Ave. MOHCD, San Francisco, CA Scope:  990 Pacific was a remodel of 7 occupied floors, 63 apartments, 18 ADA and 14 HVI (hearing and visually impaired) modified apartments, a community clubhouse, patio and kitchen.  Del Monte Electric installed all of the electrical, fire alarm systems, data, security, power and lighting.  The… Read More

New Gompers School

Location: Richmond, CAContract Amount: $6,500,000General Contractor: Lathrop Construction Project Description:This project is an interesting example of a school district making the most of its resources, both physically and financially. When the state demanded seismic upgrades to Gompers Continuation High School, as well as to charter school, LPS (Leadership Public School) West Contra Costa Unified School… Read More

CSU Maritime PE Building

Location: Vallejo, CAContract Amount: $2,644,000.00General: Gilbane Building CompanyDescription: See Testimonial letter from Gilbane, click here Project completed: 11/2014

MDUSD Solar

Location: Mt Diablo Unified School District, Contra Costa County, CA Contract Amount:$11,000,000 General Contractor: SunPower Corporation Description: This project involved the installation of fixed PV solar panels on carport structures and rooftops at fifty-one school sites. This contract included the installation of PV panels, switch gear and wiring back to the utility point of connection.… Read More

Coronado Elementary School

Location: Richmond, CAContract Amount: $3,288,000General: Lathrop ConstructionDescription: Electrical renovationProject Completed: 8/2015

San Ramon Unified School District (Phase 1)

Location: Contra Costa County, CA Contract Amount: $3,500,000 General Contractor: SunPower Corporation Description: Installation of elevated tracker PV solar panels on carport structures during the summer break at five school sites. This contract included installation of the PV panels, switchgear and wiring back to the utility point of connection.

Channing/Bowditch Apartments

Location: Berkeley Contract Amount: $1,300,000 General Contractor: J.R. Roberts CorporationDescription: Construction of a new three story 72,000 square foot apartment building on the UC Berkeley Campus. This project involved the installation of electrical and low voltage systems on a site with very limited space. Deliveries had to be carefully planned and staged to avoid impact… Read More

East County Courthouse

Construction of a new, state of the art 71,000 sq ft courthouse. Work included power distribution, emergency generator, lighting, lighting controls, fire alarm, intrusion alarm, video surveillance, access controls, telecom, public address and audio-visual systems. Included new courtrooms, public use areas and detention areas…

Alameda Free Library

Complete renovation of an existing library. Included lighting, lighting controls, power distribution, fire alarm, data, and security systems…

SERC (Chu Hall) Solar Energy Research Center

hu Hall is Berkeley Lab’s latest addition to a collection of buildings that create a hub of interactive and collaborative research.

Yerba Buena HS Student Union and Quad

More information coming soon

Equinox Sports Club

coming soon

Santa Rita Jail

Coming soon

add title

San Jose City College Physical Ed Building

More information coming soon…

ABSMC Dietary Department and MRI

ABSMC Dietary Department and MRI description

Lawrence Berkeley National FLEXLAB

One of a kind project

Fremont CA GC: McCarthy Nuilding Co.

One of our current projects located in Fremont CA