MOHCD 990 Pacific Ave. Multi Family Housing

Project Name:  990 Pacific Ave. MOHCD, San Francisco, CA Scope:  990 Pacific was a remodel of 7 occupied floors, 63 apartments, 18 ADA and 14 HVI (hearing and visually impaired) modified apartments, a community clubhouse, patio and kitchen.  Del Monte Electric installed all of the electrical, fire alarm systems, data, security, power and lighting.  The… Read More

Temporary Surge Building, UC Berkeley

Design/Build contract to provide new classroom facilities at UC Berkeley to accommodate students while existing facilities are being renovated. The electrical design needed to be as flexible as possible to accommodate students from different majors and disciplines. Read More

1333 North California

Design/build contract to provide the electrical work for the core and shell. Work included lighting, gear, fire alarm, and data systems. Read More

Exploratorium Rooftop Solar

Installation of roof mounted PV solar panels at the new Exploratorium project at Pier #15 in San Francisco. Required coordination with barge cranes to load roof and very congested staging conditions. Read More

MLK, Tyrrell, East Avenue Schools

This project involved the complete electrical, fire alarm, and intrusion alarm installations on three school sites. The work included modernization of existing buildings, wiring of new buildings, and complete electrical distribution and site work upgrades on the three sites, totaling 223,000 square feet of building space. Read More