Channing/Bowditch Apartments

Location: Berkeley Contract Amount: $1,300,000 General Contractor: J.R. Roberts Corporation Description: Construction of a new three story 72,000 square foot apartment building on the UC Berkeley Campus. This project involved the installation of electrical and low voltage systems on a site with very limited space. Deliveries had to be carefully planned and staged to avoid… Read More

San Ramon Unified School District (Phase 1)

Location: Contra Costa County, CA Contract Amount: $3,500,000 General Contractor: SunPower Corporation Description: Installation of elevated tracker PV solar panels on carport structures during the summer break at five school sites. This contract included installation of the PV panels, switchgear and wiring back to the utility point of connection.

Coronado Elementary School

Location: Richmond, CA Contract Amount: $3,288,000 General: Lathrop Construction Description: Electrical renovation Project Completed: 8/2015

MDUSD Solar

Location: Mt Diablo Unified School District, Contra Costa County, CA Contract Amount:$11,000,000 General Contractor: SunPower Corporation Description: This project involved the installation of fixed PV solar panels on carport structures and rooftops at fifty-one school sites. This contract included the installation of PV panels, switch gear and wiring back to the utility point of connection.… Read More

CSU Maritime PE Building

Location: Vallejo, CAContract Amount: $2,644,000.00General: Gilbane Building CompanyDescription: See Testimonial letter from Gilbane, click here Project completed: 11/2014

New Gompers School

Location: Richmond, CAContract Amount: $6,500,000General Contractor: Lathrop Construction Project Description:This project is an interesting example of a school district making the most of its resources, both physically and financially. When the state demanded seismic upgrades to Gompers Continuation High School, as well as to charter school, LPS (Leadership Public School) West Contra Costa Unified School… Read More

MOHCD 990 Pacific Ave. Multi Family Housing

Project Name:  990 Pacific Ave. MOHCD, San Francisco, CA Scope:  990 Pacific was a remodel of 7 occupied floors, 63 apartments, 18 ADA and 14 HVI (hearing and visually impaired) modified apartments, a community clubhouse, patio and kitchen.  Del Monte Electric installed all of the electrical, fire alarm systems, data, security, power and lighting.  The… Read More

San Ramon Community Center

Location: San Ramon Contract Amount: $2,600,000 General Contractor: J. Amoroso Construction Construction of a new 80,000 sq ft laboratory and educational facility. Work included medium voltage cable & equipment, power distribution, lighting, lighting controls, fire alarm, intrusion alarm, telecommunication and audio-visual systems.

Sutter Health 2500 Milvia Medical Office Building

Contract Amount: $1,289,000 General Contractor: Herrero Builders Design and build renovation of an existing 28,000 medical office building that was stripped down to the exterior walls and re-designed to meet current health care demands. Numerous exam rooms, office spaces, and conference spaces were designed and built with the latest technologies to meet the owner’s needs.… Read More

Berkeley Farms Processing Facility

Location: Hayward Contract Amount: $4,000,000 General Contractor: Harris Construction Description: Included all electrical work and controls for a new milk processing facility in Hayward. Included extensive motor control work.